LAND REMEDIATION

Land Remediation

We at KJB Consulting engage exclusively with the UK and European foundries, assisting them with the appropriate disposal of complex materials such as by-products and negative value products. KJB work at operational and defunct foundries that are to be developed into new housing or commercial properties. With our knowledge and expertise, the extraction of every individual site is always completed with professionalism and quality time management of our dedicated site teams. This is what makes KJB the UK’s leading consultants within the metal industry.

PLANT AND MACHINERY

We currently operate on various sites throughout the UK. Some of the most common plant and machinery we use is listed as follows:

  • crusher

    Multi Track Screeners

  • screener

    Multi Track Crushers

  • bobcat

    Shovel Loaders

  • excavator-2

    Excavators

  • construction-machine-2

    Material Handlers (L924, L954, LH50 & 60 S835)

  • loader-truck

    Bobcats

  • metal extraction plant

    Metal extraction Plant

TRANSPORT

We have various means of transporting the products around site and to the port(s) including the following:

  • truck-3

    ADT - Articulated Dump Trucks

  • truck-4

    8 Wheeler Trucks

  • tipper

    Articulated Tipper Lorries

  • Flatbed_Truck-512

    Flatbeds

  • vessels

    Vessels

    We send between 5-7 vessels to customers across the globe each year.

KJB CONSULTING

Our Site Procedure

  • 1

    Site Inspection

    One of KJB’s experienced team will always meet with the site owners to fully inspect the land and evaluate the time duration of the project and quantity we are working with.

  • 2

    Core Drills & Sampling

    This rigorous method of sampling is performed to analyse the land for a greater knowledge on where by-products and aggregates are, along with the quality

  • 3

    Laboratory Testing

    The samples are then submitted to trusted independent laboratories for analysis, gathering the key elements key to both KJB and our customers. This is repeated throughout the project to ensure continuity and quality, as well as highlight anomalies.

  • 4

    Define Results

    From the results, we prepare a suitable package to meet our client’s needs.

  • 5

    Health, Safety, Environment

    We take Health and Safety very seriously on every project we undertake. It is mandatory that all KJB employees and sub-contractors have all the correct PPE whilst on site. We also ensure all appropriate training and certification is in place as well as the documentation to be part of these projects. Our operational hours always take into consideration neighbours, the environment and other surroundings to ensure minimal disruption.

  • 6

    KJB Commercial Proposal

    The previous steps enable us to provide an entire bespoke package to our clients. The early involvement we have in projects has seen clients make huge costs savings. KJB’s experience is unrivalled and we are confident in our ability to offer an offer an appealing commercial proposal.

GET IN TOUCH

How Can We Help

Invalid Email
Invalid Number

SOCIAL MEDIA

Follow regular updates KJB Consulting

ADDRESS

3 Hazel Court, Midland Way, Barlborough, Chesterfield, S43 4FD